I figured I should start posting, so here's what I am doing today

This is just one aspect of this job.
I need to reinforce the tails of one end of each truss. I also need to increase bearing, and add a vertical 2x4 leg to the truss. Along with plywood gusset. This isn't my design in any way. I even have a nailing spec.

Greatlakesbuildersinc.com

Quote
Posted : 16/11/2016 5:34 am
 Jake
(@jake)

I got a few more trusses done. But spent most of the day making sure everything is ready for tomorrow when we get the Structual steel delivered.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 17/11/2016 7:02 am
 Jake
(@jake)

Finished some more trusses, improved on my truss jig by adding stops. Received my steel, and hoisted it up.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 18/11/2016 5:39 am
 Jake
(@jake)

Well it's Saturday and had to help a buddy out

Greatlakesbuildersinc.com

ReplyQuote
Posted : 19/11/2016 9:07 am
 Jake
(@jake)

Worked for a few hours today

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/11/2016 11:03 am
 Jake
(@jake)

Got a lot of stuff handled today. Finished more trusses, and got some of the steel up in the air. I will post pics tomorrow

Greatlakesbuildersinc.com

ReplyQuote
Posted : 21/11/2016 9:01 am
 Jake
(@jake)

Well I got most of the steel up and have 12 more trusses to finish up.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 22/11/2016 9:48 pm
 Jake
(@jake)

Monday we had a boom truck come out to help get the new trusses on the roof

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:47 am
 Jake
(@jake)

Tuesday we ripped off the roof where the trusses were too damaged to repair. Dropped in our new trusses, sheathed the roof. The roofers started immediately after

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:52 am
 Jake
(@jake)

These trusses were only five years old

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:53 am
 Jake
(@jake)

It's been to long, I've have been trying to knock out some personal stuff and a few small jobs, but I have a couple cool ones coming up.

Here's a sill plate replacement I did

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/01/2017 9:53 am
 Jake
(@jake)

Trying to make way on the shop in between jobs. Almost done with the framing.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/01/2017 9:59 am
 Jake
(@jake)

Three beam lines 81' in total 11 columns.
We removed the old beams, installed the new beams. Then jacked everything up. It came out great.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 07/02/2017 1:54 am
 Jake
(@jake)

I had nothing to do with the footings on this job or the mounds of dirt. There going to be doing a 24" basement dig out.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 07/02/2017 1:59 am
 Jake
(@jake)

Replaced 5 columns the other day cause all of the bottoms of the existing columns had rotted away

Greatlakesbuildersinc.com