Here is what I am working on today  

  RSS
 Jake

I figured I should start posting, so here's what I am doing today

This is just one aspect of this job.
I need to reinforce the tails of one end of each truss. I also need to increase bearing, and add a vertical 2x4 leg to the truss. Along with plywood gusset. This isn't my design in any way. I even have a nailing spec.

Greatlakesbuildersinc.com

Quote
Posted : 16/11/2016 5:34 am
 Jake

I got a few more trusses done. But spent most of the day making sure everything is ready for tomorrow when we get the Structual steel delivered.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 17/11/2016 7:02 am
 Jake

Finished some more trusses, improved on my truss jig by adding stops. Received my steel, and hoisted it up.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 18/11/2016 5:39 am
 Jake

Well it's Saturday and had to help a buddy out

Greatlakesbuildersinc.com

ReplyQuote
Posted : 19/11/2016 9:07 am
 Jake

Worked for a few hours today

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/11/2016 11:03 am
 Jake

Got a lot of stuff handled today. Finished more trusses, and got some of the steel up in the air. I will post pics tomorrow

Greatlakesbuildersinc.com

ReplyQuote
Posted : 21/11/2016 9:01 am
 Jake

Well I got most of the steel up and have 12 more trusses to finish up.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 22/11/2016 9:48 pm
 Jake

Monday we had a boom truck come out to help get the new trusses on the roof

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:47 am
 Jake

Tuesday we ripped off the roof where the trusses were too damaged to repair. Dropped in our new trusses, sheathed the roof. The roofers started immediately after

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:52 am
 Jake

These trusses were only five years old

Greatlakesbuildersinc.com

ReplyQuote
Posted : 30/11/2016 7:53 am
 Jake

It's been to long, I've have been trying to knock out some personal stuff and a few small jobs, but I have a couple cool ones coming up.

Here's a sill plate replacement I did

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/01/2017 9:53 am
 Jake

Trying to make way on the shop in between jobs. Almost done with the framing.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 20/01/2017 9:59 am
 Jake

Three beam lines 81' in total 11 columns.
We removed the old beams, installed the new beams. Then jacked everything up. It came out great.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 07/02/2017 1:54 am
 Jake

I had nothing to do with the footings on this job or the mounds of dirt. There going to be doing a 24" basement dig out.

Greatlakesbuildersinc.com

ReplyQuote
Posted : 07/02/2017 1:59 am
 Jake

Replaced 5 columns the other day cause all of the bottoms of the existing columns had rotted away

Greatlakesbuildersinc.com

ReplyQuote
Posted : 18/02/2017 1:07 pm